the short answer
- Test and tag means a competent person inspects and electrically tests plug-in equipment, then tags it with the result and the next due date. AS/NZS 3760:2022 sets out how.
- Under the model WHS laws, which every state and territory except Victoria runs in some form, plug-in equipment used in a hostile environment, such as outdoors, a workshop or a commercial kitchen, must be inspected and tested regularly. Details vary by state.
- Victoria has no rule that names test and tag, but WorkSafe Victoria calls regular testing necessary under the employer's general duty to keep work safe.
- Record who tested each item, when, the result and the next test date, and keep that record until the next test.
A tag on a power lead is a promise with a date on it. Someone qualified checked this lead, it passed, and it's due again on the date written underneath. Test and tag is the routine that keeps those promises current: a competent person inspects a piece of plug-in electrical equipment, runs electrical tests on it, and attaches a tag recording the result. The Australian and New Zealand standard for how it's done is AS/NZS 3760:2022, In-service safety inspection and testing of electrical equipment and RCDs.
This guide is for the owner, not the tester. It covers what the law asks of your business, how often equipment needs doing, who can do it and what to keep on file. Test and tag dates belong on the same list as the rest of your gear, which is one of the jobs our asset tracking software is being built to do.
Is test and tag a legal requirement?
It depends on your state, and on where the equipment is used. Australia runs two systems of workplace safety law, and Victoria sits on its own.
Every state and territory except Victoria
New South Wales, Queensland, South Australia, Western Australia, Tasmania, the ACT and the Northern Territory all run versions of the model WHS laws. Western Australia was the last to adopt them, on 31 March 2022. Under those laws, plug-in electrical equipment used in a hostile operating environment must be regularly inspected and tested by a competent person. WorkSafe ACT spells out the consequence: equipment that hasn't been regularly tested "must not be used until it is tested."
A hostile operating environment is one where normal use exposes equipment to conditions likely to damage it or shorten its life. WorkSafe ACT names outdoor workplaces, commercial kitchens and workshops. SafeWork NSW describes tools exposed to "moisture, heat, vibration, damage, chemicals or dust". A lead running across a building site counts. A desk lamp in a carpeted office usually doesn't.
Each state words its regulation a little differently. NSW moved to a new one in 2025, and its rules now sit in Part 4.7 of the Work Health and Safety Regulation 2025. In Queensland, read WorkSafe Queensland's testing and tagging page as well.
Victoria
Victoria never adopted the model laws, and its Occupational Health and Safety Act 2004 has no clause that names test and tag. What it has is a general duty: employers must provide systems of work that are safe so far as is reasonably practicable. WorkSafe Victoria lists the inspection, testing and maintenance of electrical equipment among the things those systems should cover. It says regular testing and tagging "is necessary to detect electrical faults and deterioration that cannot be found by visual inspection", and points employers to AS/NZS 3760:2022 for the detail.
So no Victorian regulation orders you to test and tag, yet the regulator expects a testing program. For a business with tools on job sites, that's a requirement in all but name.
Construction sites play by different rules
Building and demolition sites follow their own standard, AS/NZS 3012, with shorter intervals. WorkSafe ACT says plug-in equipment on a construction or demolition site should be inspected and tested at least every three months. That three-month cycle is why building sites often colour their tags by quarter. Our guide to test and tag colours has the chart. WorkSafe Victoria's general electrical guidance leaves construction out entirely and points to a separate industry standard.
How often does equipment need testing?
There's no single number. The interval depends on the equipment, how it's used and where. The full table sits in AS/NZS 3760:2022, which Standards Australia sells, and regulators send you there rather than reprinting it. These are the figures the regulators do publish:
| Situation | How often | Source |
|---|---|---|
| Plug-in equipment in a hostile environment | At least every 12 months, as a general rule | WorkSafe ACT |
| Construction and demolition sites | At least every 3 months | WorkSafe ACT |
| Portable safety switch (RCD), push-button test by the user, high-risk area | Every day it's used | WorkSafe Victoria |
| Portable RCD, push-button test, medium or low-risk area | Every 3 months | WorkSafe Victoria |
| Portable RCD, trip-time measurement | Every 12 months in high and medium-risk areas, every 2 years in low-risk ones | WorkSafe Victoria |
A few events trigger a test whatever the schedule says. WorkSafe ACT lists equipment that has just been repaired or serviced, second-hand equipment before its first use, and anything with no record of a previous test. Brand-new equipment straight out of the box doesn't need testing first, unless there's a reason to think it's unsafe.
Test and tag due date calculator
Pick the situation, enter the date on the tag, and you'll get the next due date and the day to book the tester.
Who can test and tag?
A competent person. SafeWork NSW defines that as someone with the knowledge and skill, gained through training, qualifications or experience, to do the task, who also has the proper testing equipment. It doesn't have to be a licensed electrician. WorkSafe Victoria draws the line this way: some people are only competent to run a pass or fail test, while a licensed electrician can also repair what fails.
You can do it in-house if someone on the team has that training and a tester. The other common setup is a tester who visits on a schedule. Either way, the records stay your job.
What a test and tag record should show
Once an item is tested, SafeWork NSW says to record, on the tag or in a register:
- the name of the person who tested it
- the date of the test
- the date the next test is due
- the outcome.
Keep that record until the equipment is next tested, permanently removed from the workplace or disposed of. That's WorkSafe ACT's rule for equipment in hostile environments, and a sensible minimum anywhere. In Victoria, WorkSafe expects records of your electrical safety program, testing and tagging included, to be available for inspection.
The tag is for workers. The register is for you.
A worker glances at the tag. An inspector or an insurer asks for the register, and that's where small businesses slip. The tester's report sits in an inbox as a PDF. Nobody knows which drill falls due next month. The list stops matching what's actually in the vans.
What fixes it is one list of every item with its next test date, and a reminder a couple of weeks before that date arrives. A spreadsheet can carry the list if one person owns it. If you already keep the list somewhere, a reminder like that is one of the admin automations we set up.
Updated 21 November 2026