Test and tag colours: what each colour means

What each test tag colour means, which months it covers, and whether your business has to use them at all.

the short answer

  • Building sites commonly rotate four colours, one for each three-month testing period: red, green, blue, then yellow.
  • The colour lets anyone spot last quarter's tag from across a site. It doesn't replace the dates written on the tag.
  • SafeWork NSW's construction fact sheet calls colour-coded tags for each period optional. The head contractor on a site can still require them.
  • Outside building sites, colours have no fixed meaning. Read the date.

Walk onto a building site in July and you'll see blue tags on the leads. In October they're yellow. That's the point of test and tag colours: on a site where every lead is tested every three months, a tag in last quarter's colour is overdue, and you can see it from ten metres away.

This guide covers what each colour means and when you have to use them. For what the law asks of you and how often equipment needs testing, read our main guide to test and tag.

The test and tag colour chart

This is the rotation tag suppliers sell, one colour for each quarter:

ColourTested in
RedDecember to February
GreenMarch to May
BlueJune to August
YellowSeptember to November

Which colour is it now?

Check a date, or decode a tag you've found:

Are test tag colours required?

Not by the NSW regulator. SafeWork NSW's fact sheet for construction and demolition sites says each tested item gets a durable, non-metallic tag that states:

  • the date it was inspected
  • the date of the next inspection
  • the name of the person who did it
  • the standard it was tested to, AS/NZS 3760.

Then it adds: "Colour coded tags for each period are optional." The dates are the requirement. The colour is a convenience.

Why building sites use colours

Colours only work when everything shares one interval. The same NSW fact sheet sets three months for most gear on a construction site:

On a construction siteHow often
Portable equipment and extension leadsEvery 3 months
Equipment in site offices and amenitiesEvery 3 months
Portable safety switch (RCD), push-button testBefore each use
Portable safety switch, operating-time testEvery 3 months
Fixed safety switch, push-button testEvery month
Fixed safety switch, operating-time testEvery 12 months

In a workshop or office, intervals run longer and differ from item to item, so a colour says little. The date on the tag does the work.

The tag is the reminder you see last

A colour tells you a lead is overdue when you're already holding it. The register is what tells you a month ahead. One list of every item with its next test date, sorted by date, means the tester gets booked before the colour changes.

Until then, a tool tracking spreadsheet with a next-test column does the job, as long as someone checks it.

Updated 21 November 2026

questions

Other questions people ask

Something else? Ask us, and we'll answer it.

What does a red test tag mean?
Under the usual rotation, the item was tested between December and February. Red doesn't mean failed. A failed item gets an out-of-service tag instead, and comes out of use.
Can we use any colour in an office or workshop?
Yes. Outside building sites there's no colour rule. What matters is the date, the tester's name and the result, on the tag and in your register.
Does the colour tell me the equipment is in date?
Only on a site where everything is tested every three months, so last quarter's colour means overdue. Anywhere with longer intervals, read the next-test date on the tag.